Data centres

Data centres that start with the energy

Bright & Green develops, builds and operates data centres in Germany and the Netherlands – from securing the land through grid connection, permitting and the energy concept to day-to-day operation.

Scope of services

Development, construction and operation under one responsibility

Bright & Green develops data centres from the first search area through to a shovel-ready site, constructs them and subsequently operates them. The company that applies for the grid connection is the company that later carries responsibility for day-to-day operation. This continuity shapes every site decision, because we secure only what we would operate ourselves.

The legal entity is B&G Holding B.V., based in Arnhem; the markets are Germany and the Netherlands. Our energy expertise derives from more than ten years in the project business, with over 1,500 solar plants built, and from the development, construction and operation of battery storage.

For reasons of confidentiality, Bright & Green publishes data-centre and storage projects under development only once they have been announced. In a personal meeting we set out which sites correspond to your requirements.

  • Development

    Development covers the search area, securing the land, the grid connection, permitting and the energy concept. The result is a shovel-ready site with a connection commitment and planning consent.

  • Construction

    Building shell, electrical systems, cooling, battery storage and the link to the substation are planned, tendered, managed and commissioned.

  • Operation

    Operation covers facility management, energy procurement, waste-heat delivery and the reporting obligations under the German Energy Efficiency Act throughout the lifetime of the asset.

Cold aisle of a server hall between rows of dark racks with blue status lights
AI Illustration
Energy first

The grid connection as the starting point of development

The limiting factor for a data centre in Germany is electrical capacity, not the land and not the technology. Grid capacity at high and extra-high voltage is scarce, and without a binding connection commitment a site can be neither valued nor financed.

Bright & Green therefore develops in reverse order: first the grid, then the land, then the building. Battery storage on site smooths the load peaks, bridges outages and releases additional usable capacity from a limited connection. Renewable generation and long-term power purchase agreements secure the supply, while the waste heat is delivered to a customer in the vicinity.

This expertise derives from the core business of the company. More than ten years of connection procedures for solar plants and battery storage have made Bright & Green familiar with the grid operators, the procedural steps and the typical sources of delay.

Energy & grid in detail
Development sequence

Six phases through to operation

The sequence follows the grid connection, because it determines the timetable of the entire project.

Development & sites in detail
Construction site of a long hall in morning light with a steel frame, two tower cranes and a concrete pump, a substation in the background
AI Illustration
  1. 01

    Site

    Search area, grid capacity, land

  2. 02

    Land & grid

    Securing, connection request, connection commitment

  3. 03

    Permits

    Land-use planning, planning consent, backup power

  4. 04

    Energy concept

    Storage, generation, waste heat

  5. 05

    Construction

    Shell, systems, commissioning

  6. 06

    Operation

    Facility management, energy, reporting duties

Where we come from

The origin of our energy expertise

For more than ten years, Bright & Green has developed, built and operated solar plants and battery storage, including over 1,500 solar plants in sizes from 0.5 to 100 MWp. That expertise is the basis on which the company develops data centres today.

0+
years of experience

energy projects in Germany and the Netherlands

0+
solar plants built

on roofs and open land

0.5–100 MWp
project sizes

from a commercial roof to a solar park

0
markets

Germany and the Netherlands

Questions and answers

Frequently asked questions about data centres